18 Aug 2017
18 Aug 2017

News: Convention Centre, Baku

0 Comment

BEMO has engineered and supplied the unique roof and façade system to the new Convention Centre in Baku, Azerbaijan. Use of the BEMO-SMOOTH system ensured that the design intent of a flat surface with triangular and photovoltaic panels could be realised.  BEMO-SMOOTH is a system that uses the standing seam system to provide the thermal.. read more →

Following a company assessment and on-site audit, BEMO UK has been awarded the Certificate of Registration for UKAS Approved ISO 9001:2008 by ACM Ltd. ISO 9001:2008 is an independently certified quality management system, and the accreditation is further evidence of the forward thinking approach of BEMO. It ensures that the high customer satisfaction already experienced by our.. read more →

With the continuing development of technology and increasing demands of unique building designs, the BEMO MONRO standing seam system is becoming more prevalent in the worldwide market. In recent years the MONRO System has been successfully designed and installed on prestigious projects such as the Mriya Resort in Crimea, the Kaohsiung Centre for the Arts in.. read more →

BEMO has worked alongside Procladd and Morgan Sindall to supply the standing seam roof to the new Primary School Campus. With sheet lengths over 100m the BEMO site-rolling capabilities came into their own. Thanks to Sky High Drones, the process was filmed: read more →

After years of planning, consultation and design, BEMO has successfully completed the manufacture of the incredibly complex roof at the National Kaohsiung Centre of the Arts in Taiwan. Designed by Dutch Architects practice Mecanoo, the 35,000m² roof involved a combination of parallel, tapered and BEMO-MONRO freeform standing seam panels. The design team took advantage of BEMO’s market-leading.. read more →

Working with our key partner Gleeson Roofing, BEMO has secured the standing seam roof envelope to the new Centre of Excellence for the Kerry Gaelic Athletic Association. This unique building is almost completely circular on plan, and required all of BEMO’s technical expertise to develop a fully tapered solution. Thanks to patented MONRO technology, BEMO.. read more →

The new sports hall in Clamart has benefitted from BEMO standing seam products to both roof and façade. The centre is designed around three separate areas, two internal and one external. The unique design, by architects Gaetan Le Penheul, demanded a complex free-flowing shape to the building. BEMO-MONRO was chosen as it allows complex geometry.. read more →

10 Nov 2016
10 Nov 2016

News: Leicester Tigers

0 Comment

With the new Premiership season well under way, the latest addition to the Welford Road stadium – home of Leicester Tigers – has impressed many a spectator. Featuring BEMO N65/400 profile in stucco embossed aluminium as the weather sheet, the roof takes advantage of the wide ranging benefits of standing seam. To ensure a continuous roof sheet.. read more →

10 Nov 2016
10 Nov 2016

News: Leicester Royal Infirmary

0 Comment

BEMO UK has supplied 2000m² of the N50/429 profile in 1.0mm Anodised Aluminium at the new A&E Department for Leicester Royal Infirmary. Installed by Advanced Roofing, the N50/429 profile was chosen for its shallower seam, while the anodised finish provided the subtle bronze appearance and excellent life expectancy required of the project. A further advantage.. read more →

01 Nov 2016
01 Nov 2016

News: BEMO Are Expanding

0 Comment

As a result of continued growth, BEMO UK has moved its operation to larger, more modern offices. Situated just north of Derby, the new offices provide excellent facilities for all staff and visitors, including state of the art training facilities and engineering platforms. With an ever-expanding team of technicians and engineers, BEMO UK is in.. read more →