Case Study: Glasgow Hockey Centre
Glasgow’s National Hockey Centre was built as part of the Commonwealth Games 2014 development. The £5.5m site, located on Glasgow Green, offers a 500 seat permanent grandstand with an additional 4,500 seats made available during the games. The international standard venue boasts two synthetic pitches and permanent floodlights, with meeting rooms and offices.
BEMO worked closely with Platinum Contractor Pro-Cladd to specify the roof system, taking advantage of the flexibility of the standing seam system.
Case Study Full Download: Glasgow Hockey Centre